No. | 
PROJECT DESCRIPTION | 
PROJECT LOCATION | 
YEAR | 
| 1 |  Supply manpower and installation of split unit (15 nos)
 Installation of electrical control panel and instrument work  | 
Petronas Gas Processing Plant (GPPB), Kerteh | 2013 | 
| 2 | Demolish and Installation of 11 HVAC Package Unit including Ducting work at 11 Analyzer house.
 Installation of electrical control panel and instrument work  | 
Petronas Gas Processing Plant (GPPB), Kerteh | 2013-2014 | 
| 3 | Fabricate, Supply and Install G.I Ducting | CARIGALI Duyong and Dulang Oil Rig | 2014 | 
| 4 | To Fabricate, supply and installa Cladding from Stainless Steel Material | CARIGALI Tiong and Duyong Platform | 2014 | 
| 5 | Demolish, Installation and construction of 3 HVAC Unit at 3 FAR Building Installation of electrical control panel and instrument work | Petronas Gas Processing Santong (GPPB) | 2014 | 
| 6 | Fabricate, Supply and Install GI Ducting for PRR4 Project with support and accessories | Petronas Gas Processing Santong (GPPB) | 2014 | 
| 7 |  Demolish and Installation of 2 HVAC Unit at 2 Sub-Station.  Fabricate, supply and install ducting for the system.
 Installation of electrical control panel and instrument work  | 
Petronas Gas Processing Santong (GPPB) | 2014 | 
| 8 | Repair, relocation, Testing & commissioning package unit | Petronas Gas Processing Paka (GPPA), | 2014 | 
| 9 | Installation and construction of 3 nos exhaust fan, including Fabricate, supply and install ducting for the system | Petronas Gas Processing Paka (GPPA), | 2015 | 
| 10 | To Supply and Fabricate Cladding from Stainless Steel Material | Malikai Deepwater, Sabah Shell, (MMHE) | 2015 | 
| 11 | Wiring ripple mill A&B | FPI Bukit Sagu | 2015 | 
| 12 | Wiring ripple mill A&B | FPI Tementi | 2015 | 
| 13 | Wiring Collecting Pump Sump System and other electrical works | FPI Keratong 9 | 2015 | 
| 14 | Exhaust Ducting, kitchen hood, exhaust fan work for kitchen | KLIA | 2016 | 
| 15 | Supply, Install and comissioning of 6 split unit | Masjid Kg Pandan | 2016 | 
| 16 | Supply Air Cond specialist, ducting specialist, electrician and skilled workers | Malikai Deepwater, Sabah Shell, (MMHE) | 2015 | 
| 17 | Construction and Installation HVAC work for 8 buildings, including Fabricate, supply and install ducting for the system
 Installation of electrical control panel and instrument work  | 
Samsung, Terengganu Gas Terminal (TGAS) | 2017 | 
| 18 | Maintenance of, 21 nos of temporary air cond and electrical for construction work at MMHE | Malikai Deepwater, Sabah Shell, (MMHE) | 2016 | 
| 19 | Installation of HVAC unit (Train B) & installation of contral panel with instrumentation | Seligi A, Enquest | 2016 | 
| 20 | Supply of manpower | TCOT, Terengganu | 2016 | 
| 21 | Project manage and execution of Supply, Installation of laminate flooring for 546 units of condominium. | Permas Jaya, Johor Bahru | Ongoing | 
| 22 | Supply of manpower | ExxonMobil, Guntong D | 2016 | 
| 23 | Supply, Install and Commissioning of 2 unit 3.5hp split unit complete with electrical tie-in | Samsung, Terengganu Gas Terminal (TGAS) | 2017 | 
| 24 | Supply, install and repair ducting complete with dampers and instrument work | Petronas Kerteh | Completed | 
| 25 | Provision of Heating, ventilation and airconditioning, maintenance services for penisular Malaysia Region for Petronas Group of Companies | Petronas Facilities, Central Region | Ongoing | 
| 26 | Supply & install HVAC for battery & UPS room for bardegg & baronia project (EPCC) | Petronas Carigali Facilities | Ongoing | 
| 27 | Provision of Engineering Consultancy and Installation at Onshore Gas Terminal Kerteh | Petronas Carigali, Kerteh | Ongoing | 
| 28 | PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF HEATING, VENTILATION AND AIR CONDITIONING (HVAC) SYSTEM AT BINTULU CRUDE OIL TERMINAL (BCOT) | Petronas Carigali, Bintulu | Ongoing | 