No. |
PROJECT DESCRIPTION |
PROJECT LOCATION |
YEAR |
1 | Supply manpower and installation of split unit (15 nos)
Installation of electrical control panel and instrument work |
Petronas Gas Processing Plant (GPPB), Kerteh | 2013 |
2 | Demolish and Installation of 11 HVAC Package Unit including Ducting work at 11 Analyzer house.
Installation of electrical control panel and instrument work |
Petronas Gas Processing Plant (GPPB), Kerteh | 2013-2014 |
3 | Fabricate, Supply and Install G.I Ducting | CARIGALI Duyong and Dulang Oil Rig | 2014 |
4 | To Fabricate, supply and installa Cladding from Stainless Steel Material | CARIGALI Tiong and Duyong Platform | 2014 |
5 | Demolish, Installation and construction of 3 HVAC Unit at 3 FAR Building Installation of electrical control panel and instrument work | Petronas Gas Processing Santong (GPPB) | 2014 |
6 | Fabricate, Supply and Install GI Ducting for PRR4 Project with support and accessories | Petronas Gas Processing Santong (GPPB) | 2014 |
7 | Demolish and Installation of 2 HVAC Unit at 2 Sub-Station. Fabricate, supply and install ducting for the system.
Installation of electrical control panel and instrument work |
Petronas Gas Processing Santong (GPPB) | 2014 |
8 | Repair, relocation, Testing & commissioning package unit | Petronas Gas Processing Paka (GPPA), | 2014 |
9 | Installation and construction of 3 nos exhaust fan, including Fabricate, supply and install ducting for the system | Petronas Gas Processing Paka (GPPA), | 2015 |
10 | To Supply and Fabricate Cladding from Stainless Steel Material | Malikai Deepwater, Sabah Shell, (MMHE) | 2015 |
11 | Wiring ripple mill A&B | FPI Bukit Sagu | 2015 |
12 | Wiring ripple mill A&B | FPI Tementi | 2015 |
13 | Wiring Collecting Pump Sump System and other electrical works | FPI Keratong 9 | 2015 |
14 | Exhaust Ducting, kitchen hood, exhaust fan work for kitchen | KLIA | 2016 |
15 | Supply, Install and comissioning of 6 split unit | Masjid Kg Pandan | 2016 |
16 | Supply Air Cond specialist, ducting specialist, electrician and skilled workers | Malikai Deepwater, Sabah Shell, (MMHE) | 2015 |
17 | Construction and Installation HVAC work for 8 buildings, including Fabricate, supply and install ducting for the system
Installation of electrical control panel and instrument work |
Samsung, Terengganu Gas Terminal (TGAS) | 2017 |
18 | Maintenance of, 21 nos of temporary air cond and electrical for construction work at MMHE | Malikai Deepwater, Sabah Shell, (MMHE) | 2016 |
19 | Installation of HVAC unit (Train B) & installation of contral panel with instrumentation | Seligi A, Enquest | 2016 |
20 | Supply of manpower | TCOT, Terengganu | 2016 |
21 | Project manage and execution of Supply, Installation of laminate flooring for 546 units of condominium. | Permas Jaya, Johor Bahru | Completed |
22 | Supply of manpower | ExxonMobil, Guntong D | 2016 |
23 | Supply, Install and Commissioning of 2 unit 3.5hp split unit complete with electrical tie-in | Samsung, Terengganu Gas Terminal (TGAS) | 2017 |
24 | Supply, install and repair ducting complete with dampers and instrument work | Petronas Kerteh | Completed |
25 | Provision of Heating, ventilation and airconditioning, maintenance services for penisular Malaysia Region for Petronas Group of Companies | Petronas Facilities, Central Region | Completed |
26 | Supply & install HVAC for battery & UPS room for bardegg & baronia project (EPCC) | Petronas Carigali Facilities | Completed |
27 | Provision of Engineering Consultancy and Installation at Onshore Gas Terminal Kerteh | Petronas Carigali, Kerteh | Completed |
28 | PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF HEATING, VENTILATION AND AIR CONDITIONING (HVAC) SYSTEM AT BINTULU CRUDE OIL TERMINAL (BCOT) | Petronas Carigali, Bintulu | Completed |
29 | 8-way Pipe PN10 110mm Black Pipe for Telekom Malaysia Bukit Anggerik Cheras | ASADRA (M) SDN BHD | Completed |
30 | 2-way Pipe PN10 150mm Red Pipe for TUDM PPU (TNB) Pulling Cable 630mm Single Core | SEGMENT EFEKTIFE SDN BHD | Completed |
31 | Trace cable sludge pit using RADIODETECTION RD8100 with skilled operator | Kilang Sawit Lepar Utara 6 (FGV) |
2015 |
32 | Supply manpower, equipment, tools and machine for electrical work for condensate tank | Kilang Sawit Kechau B (FGV) |
2015 |
33 | Repairing work for breakdown at Kilang Sawit Pasoh | Kilang Sawit Pasoh (FGV) | 2015 |
34 | Wiring ripple mill A&B |
FPI Bukit Sagu |
2015 |
35 | Wiring ripple mill A&B |
FPI Tementi |
2015 |
36 | Supply manpower, equipment, tools and machine to replace seven length of cables | Kilang Sawit Lepar Utara | 2015 |
37 | Supply manpower, equipment, tools and machine for electrical work for condensate tank | Kilang Sawit Lepar Utara | 2015 |
38 | Supply manpower, equipment, tools and machine for electrical work for shredded machine | Kilang Sawit Jengka 3 | 2015 |
39 | Pemasangan elektrik untuk pembinaan Ibu Pejabat Polis daerah (IPD) Johor Bahru Utara, Johor Darul Ta’zim. | IPD JB Utara, Jabatan Kerja Raya Malaysia. Johor Bahru Utara, Johor Darul Ta’zim |
2015 |
40 | Utama yang mengandungi 42 Bilik Darjah, dan Lain-lain Kemudahan yang berkaitan | Kota Tinggi, Johor Darul Ta’zim |
2017 |
41 | Cadangan Membina Dan Menyiapkan Sebuah Dewan Serbaguna Dan Kerja-Kerja Berkaitan Di Atas Tapak Balai Raya Sediada Lot PTD 144457, Taman Impian Emas | Majlis Perbandaran Johor Bahru Tengah, Johor Bahru, Johor Darul Ta’zim |
2020 |
42 | Proposed Two Units Light And Medium Factory At Lot 6887, Mukim Bandar Mas | KEJORA Kota Tinggi, Johor Darul Ta’zim | 2020 |
43 | Menyiapkan baki kerja mereka bentuk 300 unit rumah pangsa PPR di Pengerang, Kota Tinggi Johor | Kementerian Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan |
2021 |
44 | Kerja-Kerja Pembaikan Kecacatan Sistem Elektrikal Bagi Cadangan Membina Pusat Penyelidikan Pengolahan Efluen dan Kitar Semula Air Bagi Kompleks Intergrasi R&D Getah Mampan di Atas Sebaahgian Lot 322, Stesen Penyelidikan LGM Kota Tinggi, Johor Darul Takzim | Lembaga Getah Malaysia |
2020 |
45 | Maintenance work at LGM-ETP (Electrical) IPC | Lembaga Getah Malaysia |
2020 |
46 | Provision of General Electrical Equipment Services for PETRONAS Chemicals Derivatives Sdn. Bhd. (Package 1A) | Petronas Chemicals Derivative Sdn. Bhd. |
On-going |
47 | Contract of “Installation and Maintenance of LED Lighting for EPC PCGD Kerteh” | TNB ES / PCOGD | 2023 |
48 | Lotte Project: MV Cable Diagnostic Test at Pasir Gudang | ENI Specialist Sdn. Bhd. (Pasir Gudang) |
2020 |
49 | Generator Assembly and Disassembly | SJ Kenyir Unit 1 | 2018 |
50 | Transformer Test & HV Power Cable | Intel Technology Sdn. Bhd. |
2019 |
51 | Protection Relay Calibration | Petronas Chemical Fertilizer Sdn Bhd |
2021 |
52 | Perform Breaker Trip Test For New MCCB 50A Of Power Capacitor (Sat) | Nucleus Energy Sdn Bhd | 2021 |
53 | 132 Kv Hv Power Cable Test | Amsteel Mills Sdn Bhd, Klang |
2021 |
54 | Protection Relay Calibration | Amsteel Mills Sdn Bhd, Klang |
2021 |
55 | MV Power Cable Testing Work at PE 3 Plant | Lotte Chemical Titan (M), Tanjung Langsat |
2021 |
56 | NC1 Plant:Switchgear Current Transformer Test | Lotte Chemical Titan (M), Pasir Gudang |
2021 |
57 | Diagnostic Test Of Mv XLPE 6.6KV Rated Voltage (C2 C3 Project At Johor Port, Pasir Gudang) | Eni Specialist Sdn Bhd | 2022 |
58 | Condition Monitoring Test on 85 MVA, 33/1/1 KV Smelting Furnace Transformer After MR Tap Selector Service | Amsteel Mills Sdn Bhd, Klang |
2022 |
59 | Shutdown 2022 – Protection Relay Calibration for (442 Nos) | Malaysian Refining Company Sdn Bhd |
2022 |
60 | 11 KV VCB Panel (MC-5 Substation) Protection Relay Calibration | Amsteel Mills Sdn Bhd, Klang |
2022 |
61 | TA 2022 – Tangent Delta Test For 132 KV Switchyard Equipment | RP Chemicals Malaysia Sdn Bhd |
2022 |
62 | Protection Relay Calibration | Malaysian Refining Company Sdn Bhd |
2022 |
63 | Voltage & Current Transformer Verification and Protection Relay Calibration | Petronas Chemical Methanol Sdn Bhd, Wilayah Persekutuan Labuan |
2022 |
64 | Re-Calibration of Protection Relay | Hyundai Engineering Malaysia, Melaka |
2022 |
65 | Air Circuit Breaker (ACB) Test | RP Chemicals Malaysia Sdn Bhd |
2022 |
66 | Proposal to Build a N.P.K Fertilizer Warehouse in Westport, Klang, Selangor |
Sinergi Sdn Bhd | 2015 |
67 | Construct and complete an additional building block of four (4) floors, a school building special education and related work at school Cab. Chiku 7, Gua Musang, Kelantan” |
JKR | Completed |
68 | Upgrading works for hostel block A and block B and centre of registration building at Institute Kemajuan Desa (INFRA) | KKLB | 2013 |
69 | Renovation works for korea rental warehouse at Palm Spring Kota Damansara, Petaling Jaya, Selangor | K Rental Networks Sdn Bhd |
2022 |
70 | Renovation works for warehouse at 14, Jalan TSB 5, Kota Damansara | Chungho (M) Sdn Bhd. | 2023 |
71 | 4-way Pipe PN10 110mm Black Pipe for Telekom Malaysia Sentul | ASADRA (M) SDN BHD | Completed |
72 | 1 cct 33kV for TNB at PMU Pandamaran to PPU Cargill Pulling Cable | TIANU SDN BHD | Completed |
73 | 1 cct 33kV for TNB at PPU Bandar Baru Bangi to SSU Stenta Film HDD Method | TIANU SDN BHD | Completed |
74 | Supply and Install New Information Boards at Level 6, Wisma Kontena for Johor Port Berhad | JPB | On-going |
75 | Construct New Stages for Photographer Platform and Raise Up Platform for Photo Session at Level 6, Wisma Kontena for Johor Port Berhad. | JPB | On-going |
76 | Work to Lay 33kV Cables at SSU Cargill Palm – TNB | TNB Distribution | Completed |
77 | Supply and Deliver Two (2) Units of New Electric Cars for Use at MIROS PC3 Laboratory, Melaka | MIROS | Completed |
78 | Electrical Exhaust Fan for LQ Annex Project | DESB | Completed |
79 | Supply and Deliver Roof Exhaust Fan | MALAKOFF | Completed |
80 | Supply, Install, Calibrate, and Deliver Sensor Instrumentation for Q6 and Q10 Dummy, as well as Supply, Install, Calibrate, and Deliver Sensor Instrumentation and Data Logger for WorldSID-50 Dummy for Use at MIROS PC3 Laboratory, MIROS | MIROS | On-going |
81 | Maintenance of Mechanical Sdn Bhd Equipment for Gas District Cooling (M) | GDCM | On-going |
82 | To Supply and Corrective Maintenance (CM) for AHU-GM2-8 | GDCM | On-going |
OUR CLIENTS
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
|
|
|