Previous Project

TRACK RECORD 

 No.  

PROJECT DESCRIPTION

 PROJECT LOCATION

 YEAR

 1 Supply manpower and installation of split unit (15 nos)

Installation of electrical control panel and instrument work

 Petronas Gas Processing Plant (GPPB), Kerteh 2013
2 Demolish and Installation of 11 HVAC Package Unit including Ducting work at 11 Analyzer house.

Installation of electrical control panel and instrument work

Petronas Gas Processing Plant (GPPB), Kerteh 2013-2014
3 Fabricate, Supply and Install G.I Ducting  CARIGALI Duyong and Dulang Oil Rig  2014
4 To Fabricate, supply and installa Cladding from Stainless Steel Material  CARIGALI Tiong and Duyong Platform  2014
Demolish, Installation and construction of 3 HVAC Unit at 3 FAR Building Installation of electrical control panel and instrument work  Petronas Gas Processing Santong (GPPB)  2014
6 Fabricate, Supply and Install GI Ducting for PRR4 Project with support and accessories Petronas Gas Processing Santong (GPPB) 2014
 Demolish and Installation of 2 HVAC Unit at 2 Sub-Station.  Fabricate, supply and install ducting for the system.

Installation of electrical control panel and instrument work

 Petronas Gas Processing Santong (GPPB)  2014
8 Repair, relocation, Testing & commissioning package unit Petronas Gas Processing Paka (GPPA), 2014
9 Installation and construction of 3 nos exhaust fan, including Fabricate, supply and install ducting for the system Petronas Gas Processing Paka (GPPA), 2015
10 To Supply and Fabricate Cladding from Stainless Steel Material Malikai Deepwater, Sabah Shell, (MMHE) 2015
11 Wiring ripple mill A&B FPI Bukit Sagu  2015
12 Wiring ripple mill A&B FPI Tementi  2015
13   Wiring Collecting Pump Sump System and other electrical works  FPI Keratong 9  2015
14   Exhaust Ducting, kitchen hood, exhaust fan work for kitchen  KLIA  2016
15 Supply, Install and comissioning of 6 split unit Masjid Kg Pandan 2016
16 Supply Air Cond specialist, ducting specialist, electrician and skilled workers Malikai Deepwater, Sabah Shell, (MMHE) 2015
17 Construction and Installation HVAC work for 8 buildings, including Fabricate, supply and install ducting for the system

Installation of electrical control panel and instrument work

Samsung, Terengganu Gas Terminal (TGAS) 2017
18 Maintenance of, 21 nos of temporary air cond and electrical  for construction work at MMHE Malikai Deepwater, Sabah Shell, (MMHE) 2016
19 Installation of HVAC unit (Train B) & installation of contral panel with instrumentation Seligi A, Enquest 2016
20 Supply of manpower TCOT, Terengganu 2016
21 Project manage and  execution of Supply, Installation of laminate flooring for 546 units of condominium. Permas Jaya, Johor Bahru Completed
22 Supply of manpower ExxonMobil, Guntong D 2016
23 Supply, Install and Commissioning of 2 unit 3.5hp split unit  complete with electrical tie-in Samsung, Terengganu Gas Terminal (TGAS) 2017
24 Supply, install and repair ducting complete with dampers and instrument work Petronas Kerteh Completed
25 Provision of Heating, ventilation and airconditioning, maintenance services for penisular Malaysia Region for Petronas Group of Companies Petronas Facilities, Central Region Completed
26 Supply & install HVAC for battery & UPS room for bardegg & baronia project (EPCC) Petronas Carigali Facilities Completed
27 Provision of Engineering Consultancy and Installation at Onshore Gas Terminal Kerteh  Petronas Carigali, Kerteh Completed
28 PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF HEATING, VENTILATION AND AIR CONDITIONING (HVAC) SYSTEM AT BINTULU CRUDE OIL TERMINAL (BCOT) Petronas Carigali, Bintulu Completed
29 8-way Pipe PN10 110mm Black Pipe for Telekom Malaysia Bukit Anggerik Cheras ASADRA (M) SDN BHD Completed
30 2-way Pipe PN10 150mm Red Pipe for TUDM PPU (TNB) Pulling Cable 630mm Single Core SEGMENT EFEKTIFE SDN BHD  Completed
31 Trace cable sludge pit using RADIODETECTION RD8100 with skilled operator Kilang Sawit Lepar Utara 6
(FGV)
2015
32 Supply manpower, equipment, tools and machine for electrical work for condensate tank Kilang Sawit Kechau B (FGV)
2015
33 Repairing work for breakdown at Kilang Sawit Pasoh Kilang Sawit Pasoh (FGV) 2015
34 Wiring ripple mill A&B
FPI Bukit Sagu
2015
35 Wiring ripple mill A&B
FPI Tementi
2015
36 Supply manpower, equipment, tools and machine to replace seven length of cables Kilang Sawit Lepar Utara 2015
37 Supply manpower, equipment, tools and machine for electrical work for condensate tank Kilang Sawit Lepar Utara 2015
38 Supply manpower, equipment, tools and machine for electrical work for shredded machine Kilang Sawit Jengka 3 2015
39 Pemasangan elektrik untuk pembinaan Ibu Pejabat Polis daerah (IPD) Johor Bahru Utara, Johor Darul Ta’zim. IPD JB Utara, Jabatan Kerja
Raya Malaysia. Johor Bahru
Utara, Johor Darul Ta’zim
2015
40 Utama yang mengandungi 42 Bilik Darjah, dan Lain-lain Kemudahan yang berkaitan Kota Tinggi, Johor Darul Ta’zim
2017
41 Cadangan Membina Dan Menyiapkan Sebuah Dewan Serbaguna Dan Kerja-Kerja Berkaitan Di Atas Tapak Balai Raya Sediada Lot PTD 144457, Taman Impian Emas Majlis Perbandaran Johor Bahru
Tengah, Johor Bahru, Johor Darul
Ta’zim
2020
42 Proposed Two Units Light And Medium Factory At Lot 6887, Mukim Bandar Mas KEJORA Kota Tinggi, Johor Darul Ta’zim 2020
43 Menyiapkan baki kerja mereka bentuk 300 unit rumah pangsa PPR di Pengerang, Kota Tinggi Johor Kementerian Kesejahteraan Bandar,
Perumahan dan Kerajaan Tempatan
2021
44 Kerja-Kerja Pembaikan Kecacatan Sistem Elektrikal Bagi Cadangan Membina Pusat Penyelidikan Pengolahan Efluen dan Kitar Semula Air Bagi Kompleks Intergrasi R&D Getah Mampan di Atas Sebaahgian Lot 322, Stesen Penyelidikan LGM Kota Tinggi, Johor Darul Takzim Lembaga Getah Malaysia
2020
45 Maintenance work at LGM-ETP (Electrical) IPC Lembaga Getah Malaysia
2020
46 Provision of General Electrical Equipment Services for PETRONAS Chemicals Derivatives Sdn. Bhd. (Package 1A) Petronas Chemicals Derivative Sdn.
Bhd.
On-going
47 Contract of “Installation and Maintenance of LED Lighting for EPC PCGD Kerteh” TNB ES / PCOGD 2023
48 Lotte Project: MV Cable Diagnostic Test at Pasir Gudang ENI Specialist Sdn. Bhd.
(Pasir Gudang)
2020
49 Generator Assembly and Disassembly SJ Kenyir Unit 1 2018
50 Transformer Test & HV Power Cable Intel Technology Sdn.
Bhd.
2019
51 Protection Relay Calibration Petronas Chemical
Fertilizer Sdn Bhd
2021
52 Perform Breaker Trip Test For New MCCB 50A Of Power Capacitor (Sat) Nucleus Energy Sdn Bhd 2021
53 132 Kv Hv Power Cable Test Amsteel Mills Sdn Bhd,
Klang
2021
54 Protection Relay Calibration Amsteel Mills Sdn Bhd,
Klang
2021
55 MV Power Cable Testing Work at PE 3 Plant Lotte Chemical Titan (M),
Tanjung Langsat
2021
56 NC1 Plant:Switchgear Current Transformer Test Lotte Chemical Titan (M),
Pasir Gudang
2021
57 Diagnostic Test Of Mv XLPE 6.6KV Rated Voltage (C2 C3 Project At Johor Port, Pasir Gudang) Eni Specialist Sdn Bhd 2022
58 Condition Monitoring Test on 85 MVA, 33/1/1 KV Smelting Furnace Transformer After MR Tap Selector Service Amsteel Mills Sdn Bhd, Klang
2022
59 Shutdown 2022 – Protection Relay Calibration for (442 Nos) Malaysian Refining
Company Sdn Bhd
2022
60 11 KV VCB Panel (MC-5 Substation) Protection Relay Calibration Amsteel Mills Sdn Bhd,
Klang
2022
61 TA 2022 – Tangent Delta Test For 132 KV Switchyard Equipment RP Chemicals Malaysia
Sdn Bhd
2022
62 Protection Relay Calibration Malaysian Refining
Company Sdn Bhd
2022
63 Voltage & Current Transformer Verification and Protection Relay Calibration Petronas Chemical Methanol Sdn Bhd, Wilayah
Persekutuan
Labuan
2022
64 Re-Calibration of Protection Relay Hyundai Engineering
Malaysia, Melaka
2022
65 Air Circuit Breaker (ACB) Test RP Chemicals Malaysia
Sdn Bhd
2022
66 Proposal to Build a N.P.K Fertilizer Warehouse in
Westport, Klang, Selangor
Sinergi Sdn Bhd 2015
67 Construct and complete an additional building block of four (4) floors, a school building
special education and related work at school Cab. Chiku 7, Gua Musang, Kelantan”
JKR Completed
68 Upgrading works for hostel block A and block B and centre of registration building at Institute Kemajuan Desa (INFRA) KKLB 2013
69 Renovation works for korea rental warehouse at Palm Spring Kota Damansara, Petaling Jaya, Selangor K Rental Networks Sdn
Bhd
2022
70 Renovation works for warehouse at 14, Jalan TSB 5, Kota Damansara Chungho (M) Sdn Bhd. 2023
71 4-way Pipe PN10 110mm Black Pipe for Telekom Malaysia Sentul ASADRA (M) SDN BHD Completed
72 1 cct 33kV for TNB at PMU Pandamaran to PPU Cargill Pulling Cable TIANU SDN BHD Completed
73 1 cct 33kV for TNB at PPU Bandar Baru Bangi to SSU Stenta Film HDD Method TIANU SDN BHD Completed
74 Supply and Install New Information Boards at Level 6, Wisma Kontena for Johor Port Berhad JPB On-going
75 Construct New Stages for Photographer Platform and Raise Up Platform for Photo Session at Level 6, Wisma Kontena for Johor Port Berhad. JPB On-going
76 Work to Lay 33kV Cables at SSU Cargill Palm – TNB TNB Distribution Completed
77 Supply and Deliver Two (2) Units of New Electric Cars for Use at MIROS PC3 Laboratory, Melaka MIROS Completed
78 Electrical Exhaust Fan for LQ Annex Project DESB Completed
79 Supply and Deliver Roof Exhaust Fan MALAKOFF Completed
80 Supply, Install, Calibrate, and Deliver Sensor Instrumentation for Q6 and Q10 Dummy, as well as Supply, Install, Calibrate, and Deliver Sensor Instrumentation and Data Logger for WorldSID-50 Dummy for Use at MIROS PC3 Laboratory, MIROS MIROS On-going
81 Maintenance of Mechanical Sdn Bhd Equipment for Gas District Cooling (M) GDCM On-going
82 To Supply and Corrective Maintenance (CM) for AHU-GM2-8  GDCM On-going