Previous Project

TRACK RECORD 

 No.  

PROJECT DESCRIPTION

 PROJECT LOCATION

 YEAR

 1  Supply manpower and installation of split unit (15 nos)

Installation of electrical control panel and instrument work

 Petronas Gas Processing Plant (GPPB), Kerteh 2013
2 Demolish and Installation of 11 HVAC Package Unit including Ducting work at 11 Analyzer house.

Installation of electrical control panel and instrument work

Petronas Gas Processing Plant (GPPB), Kerteh 2013-2014
3  Fabricate, Supply and Install G.I Ducting  CARIGALI Duyong and Dulang Oil Rig  2014
4  To Fabricate, supply and installa Cladding from Stainless Steel Material  CARIGALI Tiong and Duyong Platform  2014
 Demolish, Installation and construction of 3 HVAC Unit at 3 FAR Building Installation of electrical control panel and instrument work  Petronas Gas Processing Santong (GPPB)  2014
6 Fabricate, Supply and Install GI Ducting for PRR4 Project with support and accessories Petronas Gas Processing Santong (GPPB) 2014
 Demolish and Installation of 2 HVAC Unit at 2 Sub-Station.  Fabricate, supply and install ducting for the system.

Installation of electrical control panel and instrument work

 Petronas Gas Processing Santong (GPPB)  2014
8 Repair, relocation, Testing & commissioning package unit Petronas Gas Processing Paka (GPPA), 2014
9 Installation and construction of 3 nos exhaust fan, including Fabricate, supply and install ducting for the system Petronas Gas Processing Paka (GPPA), 2015
10 To Supply and Fabricate Cladding from Stainless Steel Material Malikai Deepwater, Sabah Shell, (MMHE) 2015
11 Wiring ripple mill A&B FPI Bukit Sagu  2015
12 Wiring ripple mill A&B FPI Tementi  2015
13   Wiring Collecting Pump Sump System and other electrical works  FPI Keratong 9  2015
14   Exhaust Ducting, kitchen hood, exhaust fan work for kitchen  KLIA  2016
15 Supply, Install and comissioning of 6 split unit Masjid Kg Pandan 2016
16 Supply Air Cond specialist, ducting specialist, electrician and skilled workers Malikai Deepwater, Sabah Shell, (MMHE) 2015
17 Construction and Installation HVAC work for 8 buildings, including Fabricate, supply and install ducting for the system

Installation of electrical control panel and instrument work

Samsung, Terengganu Gas Terminal (TGAS) 2017
18 Maintenance of, 21 nos of temporary air cond and electrical  for construction work at MMHE Malikai Deepwater, Sabah Shell, (MMHE) 2016
19 Installation of HVAC unit (Train B) & installation of contral panel with instrumentation Seligi A, Enquest 2016
20 Supply of manpower TCOT, Terengganu 2016
21 Project manage and  execution of Supply, Installation of laminate flooring for 546 units of condominium. Permas Jaya, Johor Bahru Ongoing
22 Supply of manpower ExxonMobil, Guntong D 2016
23 Supply, Install and Commissioning of 2 unit 3.5hp split unit  complete with electrical tie-in Samsung, Terengganu Gas Terminal (TGAS) 2017
24 Supply, install and repair ducting complete with dampers and instrument work Petronas Kerteh Completed
25 Provision of Heating, ventilation and airconditioning, maintenance services for penisular Malaysia Region for Petronas Group of Companies Petronas Facilities, Central Region Ongoing
26 Supply & install HVAC for battery & UPS room for bardegg & baronia project (EPCC) Petronas Carigali Facilities Ongoing
27 Provision of Engineering Consultancy and Installation at Onshore Gas Terminal Kerteh  Petronas Carigali, Kerteh Ongoing
28 PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF HEATING, VENTILATION AND AIR CONDITIONING (HVAC) SYSTEM AT BINTULU CRUDE OIL TERMINAL (BCOT) Petronas Carigali, Bintulu Ongoing