Previous Project

 No.  

PROJECT DESCRIPTION

 PROJECT LOCATION

 YEAR/STATUS

 1Supply manpower and installation of split unit (15 nos)

Installation of electrical control panel and instrument work

 Petronas Gas Processing Plant (GPPB), Kerteh2013
2Demolish and Installation of 11 HVAC Package Unit including Ducting work at 11 Analyzer house.

Installation of electrical control panel and instrument work

Petronas Gas Processing Plant (GPPB), Kerteh2013-2014
3Fabricate, Supply and Install G.I Ducting CARIGALI Duyong and Dulang Oil Rig 2014
4To Fabricate, supply and installa Cladding from Stainless Steel Material CARIGALI Tiong and Duyong Platform 2014
Demolish, Installation and construction of 3 HVAC Unit at 3 FAR Building Installation of electrical control panel and instrument work Petronas Gas Processing Santong (GPPB)  2014
6Fabricate, Supply and Install GI Ducting for PRR4 Project with support and accessoriesPetronas Gas Processing Santong (GPPB)2014
 Demolish and Installation of 2 HVAC Unit at 2 Sub-Station.  Fabricate, supply and install ducting for the system.

Installation of electrical control panel and instrument work

 Petronas Gas Processing Santong (GPPB) 2014
8Repair, relocation, Testing & commissioning package unitPetronas Gas Processing Paka (GPPA),2014
9Installation and construction of 3 nos exhaust fan, including Fabricate, supply and install ducting for the systemPetronas Gas Processing Paka (GPPA),2015
10To Supply and Fabricate Cladding from Stainless Steel MaterialMalikai Deepwater, Sabah Shell, (MMHE)2015
11Wiring ripple mill A&BFPI Bukit Sagu 2015
12Wiring ripple mill A&BFPI Tementi 2015
13  Wiring Collecting Pump Sump System and other electrical works FPI Keratong 9 2015
14  Exhaust Ducting, kitchen hood, exhaust fan work for kitchen KLIA 2016
15Supply, Install and comissioning of 6 split unitMasjid Kg Pandan2016
16Supply Air Cond specialist, ducting specialist, electrician and skilled workersMalikai Deepwater, Sabah Shell, (MMHE)2015
17Construction and Installation HVAC work for 8 buildings, including Fabricate, supply and install ducting for the system

Installation of electrical control panel and instrument work

Samsung, Terengganu Gas Terminal (TGAS)2017
18Maintenance of, 21 nos of temporary air cond and electrical  for construction work at MMHEMalikai Deepwater, Sabah Shell, (MMHE)2016
19Installation of HVAC unit (Train B) & installation of contral panel with instrumentationSeligi A, Enquest2016
20Supply of manpowerTCOT, Terengganu2016
21Project manage and  execution of Supply, Installation of laminate flooring for 546 units of condominium.Permas Jaya, Johor BahruCompleted
22Supply of manpowerExxonMobil, Guntong D2016
23Supply, Install and Commissioning of 2 unit 3.5hp split unit  complete with electrical tie-inSamsung, Terengganu Gas Terminal (TGAS)2017
24Supply, install and repair ducting complete with dampers and instrument workPetronas KertehCompleted
25Provision of Heating, ventilation and airconditioning, maintenance services for penisular Malaysia Region for Petronas Group of CompaniesPetronas Facilities, Central RegionCompleted
26Supply & install HVAC for battery & UPS room for bardegg & baronia project (EPCC)Petronas Carigali FacilitiesCompleted
27Provision of Engineering Consultancy and Installation at Onshore Gas Terminal Kerteh Petronas Carigali, KertehCompleted
28PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF HEATING, VENTILATION AND AIR CONDITIONING (HVAC) SYSTEM AT BINTULU CRUDE OIL TERMINAL (BCOT)Petronas Carigali, BintuluCompleted
298-way Pipe PN10 110mm Black Pipe for Telekom Malaysia Bukit Anggerik CherasASADRA (M) SDN BHDCompleted
302-way Pipe PN10 150mm Red Pipe for TUDM PPU (TNB) Pulling Cable 630mm Single CoreSEGMENT EFEKTIFE SDN BHD Completed
31 Trace cable sludge pit using RADIODETECTION RD8100 with skilled operatorKilang Sawit Lepar Utara 6
(FGV)
2015
32 Supply manpower, equipment, tools and machine for electrical work for condensate tank Kilang Sawit Kechau B (FGV)
2015
33Repairing work for breakdown at Kilang Sawit PasohKilang Sawit Pasoh (FGV)2015
34 Wiring ripple mill A&B
FPI Bukit Sagu
2015
35 Wiring ripple mill A&B
FPI Tementi
2015
36 Supply manpower, equipment, tools and machine to replace seven length of cablesKilang Sawit Lepar Utara2015
37Supply manpower, equipment, tools and machine for electrical work for condensate tankKilang Sawit Lepar Utara 2015
38Supply manpower, equipment, tools and machine for electrical work for shredded machineKilang Sawit Jengka 32015
39Pemasangan elektrik untuk pembinaan Ibu Pejabat Polis daerah (IPD) Johor Bahru Utara, Johor Darul Ta’zim. IPD JB Utara, Jabatan Kerja
Raya Malaysia. Johor Bahru
Utara, Johor Darul Ta’zim
2015
40Utama yang mengandungi 42 Bilik Darjah, dan Lain-lain Kemudahan yang berkaitanKota Tinggi, Johor Darul Ta’zim
2017
41Cadangan Membina Dan Menyiapkan Sebuah Dewan Serbaguna Dan Kerja-Kerja Berkaitan Di Atas Tapak Balai Raya Sediada Lot PTD 144457, Taman Impian Emas Majlis Perbandaran Johor Bahru
Tengah, Johor Bahru, Johor Darul
Ta’zim
2020
42Proposed Two Units Light And Medium Factory At Lot 6887, Mukim Bandar MasKEJORA Kota Tinggi, Johor Darul Ta’zim2020
43 Menyiapkan baki kerja mereka bentuk 300 unit rumah pangsa PPR di Pengerang, Kota Tinggi JohorKementerian Kesejahteraan Bandar,
Perumahan dan Kerajaan Tempatan
2021
44Kerja-Kerja Pembaikan Kecacatan Sistem Elektrikal Bagi Cadangan Membina Pusat Penyelidikan Pengolahan Efluen dan Kitar Semula Air Bagi Kompleks Intergrasi R&D Getah Mampan di Atas Sebaahgian Lot 322, Stesen Penyelidikan LGM Kota Tinggi, Johor Darul Takzim Lembaga Getah Malaysia
2020
45Maintenance work at LGM-ETP (Electrical) IPC Lembaga Getah Malaysia
2020
46Provision of General Electrical Equipment Services for PETRONAS Chemicals Derivatives Sdn. Bhd. (Package 1A) Petronas Chemicals Derivative Sdn.
Bhd.
On-going
47Contract of “Installation and Maintenance of LED Lighting for EPC PCGD Kerteh” TNB ES / PCOGD2023
48Lotte Project: MV Cable Diagnostic Test at Pasir Gudang ENI Specialist Sdn. Bhd.
(Pasir Gudang)
2020
49Generator Assembly and DisassemblySJ Kenyir Unit 12018
50Transformer Test & HV Power CableIntel Technology Sdn.
Bhd.
2019
51Protection Relay Calibration Petronas Chemical
Fertilizer Sdn Bhd
2021
52 Perform Breaker Trip Test For New MCCB 50A Of Power Capacitor (Sat)Nucleus Energy Sdn Bhd2021
53132 Kv Hv Power Cable Test Amsteel Mills Sdn Bhd,
Klang
2021
54Protection Relay CalibrationAmsteel Mills Sdn Bhd,
Klang
2021
55MV Power Cable Testing Work at PE 3 PlantLotte Chemical Titan (M),
Tanjung Langsat
2021
56NC1 Plant:Switchgear Current Transformer TestLotte Chemical Titan (M),
Pasir Gudang
2021
57Diagnostic Test Of Mv XLPE 6.6KV Rated Voltage (C2 C3 Project At Johor Port, Pasir Gudang)Eni Specialist Sdn Bhd2022
58 Condition Monitoring Test on 85 MVA, 33/1/1 KV Smelting Furnace Transformer After MR Tap Selector Service Amsteel Mills Sdn Bhd, Klang
2022
59Shutdown 2022 – Protection Relay Calibration for (442 Nos)Malaysian Refining
Company Sdn Bhd
2022
6011 KV VCB Panel (MC-5 Substation) Protection Relay CalibrationAmsteel Mills Sdn Bhd,
Klang
2022
61TA 2022 – Tangent Delta Test For 132 KV Switchyard EquipmentRP Chemicals Malaysia
Sdn Bhd
2022
62Protection Relay Calibration Malaysian Refining
Company Sdn Bhd
2022
63Voltage & Current Transformer Verification and Protection Relay Calibration Petronas Chemical Methanol Sdn Bhd, Wilayah
Persekutuan
Labuan
2022
64Re-Calibration of Protection RelayHyundai Engineering
Malaysia, Melaka
2022
65Air Circuit Breaker (ACB) TestRP Chemicals Malaysia
Sdn Bhd
2022
66Proposal to Build a N.P.K Fertilizer Warehouse in
Westport, Klang, Selangor
Sinergi Sdn Bhd2015
67Construct and complete an additional building block of four (4) floors, a school building
special education and related work at school Cab. Chiku 7, Gua Musang, Kelantan”
JKRCompleted
68Upgrading works for hostel block A and block B and centre of registration building at Institute Kemajuan Desa (INFRA)KKLB2013
69Renovation works for korea rental warehouse at Palm Spring Kota Damansara, Petaling Jaya, SelangorK Rental Networks Sdn
Bhd
2022
70Renovation works for warehouse at 14, Jalan TSB 5, Kota DamansaraChungho (M) Sdn Bhd.2023
714-way Pipe PN10 110mm Black Pipe for Telekom Malaysia Sentul ASADRA (M) SDN BHDCompleted
721 cct 33kV for TNB at PMU Pandamaran to PPU Cargill Pulling CableTIANU SDN BHDCompleted
73 1 cct 33kV for TNB at PPU Bandar Baru Bangi to SSU Stenta Film HDD Method TIANU SDN BHD Completed
74Supply and Install New Information Boards at Level 6, Wisma Kontena for Johor Port BerhadJPBOn-going
75Construct New Stages for Photographer Platform and Raise Up Platform for Photo Session at Level 6, Wisma Kontena for Johor Port Berhad.JPBOn-going
76Work to Lay 33kV Cables at SSU Cargill Palm – TNBTNB DistributionCompleted
77Supply and Deliver Two (2) Units of New Electric Cars for Use at MIROS PC3 Laboratory, MelakaMIROSCompleted
78Electrical Exhaust Fan for LQ Annex ProjectDESBCompleted
79Supply and Deliver Roof Exhaust FanMALAKOFFCompleted
80Supply, Install, Calibrate, and Deliver Sensor Instrumentation for Q6 and Q10 Dummy, as well as Supply, Install, Calibrate, and Deliver Sensor Instrumentation and Data Logger for WorldSID-50 Dummy for Use at MIROS PC3 Laboratory, MIROSMIROSOn-going
81Maintenance of Mechanical Sdn Bhd Equipment for Gas District Cooling (M)GDCMOn-going
82To Supply and Corrective Maintenance (CM) for AHU-GM2-8 GDCMOn-going
831cct 132 kv PMU NUSAJAYA- GDSRentak Segar SDN BHD2024
8411kv PE JALAN SONGKET – Jalan SONGKET 5Nura Angkasa SDN BHD2023
8511kv LRA KAHANG-PMU BT4 KLUANGYM Teras2022
861cct 33kv PPU ARA SENDAYAN – SSU AJINAMOTOMotobina SDN BHD2025
873cct 33kv. PPU AFIAT – PMU PERLINGMotobina SDN BHD2025
88)40mm polypipe 6 way YTL,- data center kulai – tg pelepas Sutera Utama2024
8940mm polypipe 6way YTL, -data center kulai – menara ansarSutera Utama2024
9040mm poly pipe 6 way. SPEDDLINK – kedex – nusantaraFamm Fatt SDN BHD2024
91To Supply and Corrective Maintenance (CM) for AHU-GM2-8GDCM2025
92Horizontal Directional Drilling(HDD) PROJECT – SEDELIMOTOBINA2025
93Membekal perkhidmatan reprogramming VSD untuk kegunaan Jabatan Kejuruteraan Mekanikal dan Pembuatan.UKM2025
94Horizontal Directional Drilling(HDD) PROJECT – SELESA JAYA, JOHORFASTPRO/ DATUM ENERGY2025
95HVAC refurbishment for Medical manufacturing facilitiesIlham Karya Sdn Bhd2025
96To design M&E system for gas station PETRONAS M RESIDENCEESEF ACE ENTERPRISE2025
97To check condition cable for 11KV for underground cable TNBTCI2025
98Furnace 3 Shutdown YM-1363PCOGD2025
99Horizontal Directional Drilling(HDD) PROJECT – BATU ANAM, SEGAMAT, JOHORTELCOLINK NETWORK2025
100Horizontal Directional Drilling(HDD) PROJECT – BATU KURAU, PERAKWCWL COMMUNICATION2025

 