No. | 
PROJECT DESCRIPTION | 
PROJECT LOCATION | YEAR/STATUS | 
| 1 | Supply manpower and installation of split unit (15 nos)
 Installation of electrical control panel and instrument work  | Petronas Gas Processing Plant (GPPB), Kerteh | 2013 | 
| 2 | Demolish and Installation of 11 HVAC Package Unit including Ducting work at 11 Analyzer house.
 Installation of electrical control panel and instrument work  | Petronas Gas Processing Plant (GPPB), Kerteh | 2013-2014 | 
| 3 | Fabricate, Supply and Install G.I Ducting | CARIGALI Duyong and Dulang Oil Rig | 2014 | 
| 4 | To Fabricate, supply and installa Cladding from Stainless Steel Material | CARIGALI Tiong and Duyong Platform | 2014 | 
| 5 | Demolish, Installation and construction of 3 HVAC Unit at 3 FAR Building Installation of electrical control panel and instrument work | Petronas Gas Processing Santong (GPPB) | 2014 | 
| 6 | Fabricate, Supply and Install GI Ducting for PRR4 Project with support and accessories | Petronas Gas Processing Santong (GPPB) | 2014 | 
| 7 |  Demolish and Installation of 2 HVAC Unit at 2 Sub-Station.  Fabricate, supply and install ducting for the system.
 Installation of electrical control panel and instrument work  | Petronas Gas Processing Santong (GPPB) | 2014 | 
| 8 | Repair, relocation, Testing & commissioning package unit | Petronas Gas Processing Paka (GPPA), | 2014 | 
| 9 | Installation and construction of 3 nos exhaust fan, including Fabricate, supply and install ducting for the system | Petronas Gas Processing Paka (GPPA), | 2015 | 
| 10 | To Supply and Fabricate Cladding from Stainless Steel Material | Malikai Deepwater, Sabah Shell, (MMHE) | 2015 | 
| 11 | Wiring ripple mill A&B | FPI Bukit Sagu | 2015 | 
| 12 | Wiring ripple mill A&B | FPI Tementi | 2015 | 
| 13 | Wiring Collecting Pump Sump System and other electrical works | FPI Keratong 9 | 2015 | 
| 14 | Exhaust Ducting, kitchen hood, exhaust fan work for kitchen | KLIA | 2016 | 
| 15 | Supply, Install and comissioning of 6 split unit | Masjid Kg Pandan | 2016 | 
| 16 | Supply Air Cond specialist, ducting specialist, electrician and skilled workers | Malikai Deepwater, Sabah Shell, (MMHE) | 2015 | 
| 17 | Construction and Installation HVAC work for 8 buildings, including Fabricate, supply and install ducting for the system
 Installation of electrical control panel and instrument work  | Samsung, Terengganu Gas Terminal (TGAS) | 2017 | 
| 18 | Maintenance of, 21 nos of temporary air cond and electrical for construction work at MMHE | Malikai Deepwater, Sabah Shell, (MMHE) | 2016 | 
| 19 | Installation of HVAC unit (Train B) & installation of contral panel with instrumentation | Seligi A, Enquest | 2016 | 
| 20 | Supply of manpower | TCOT, Terengganu | 2016 | 
| 21 | Project manage and execution of Supply, Installation of laminate flooring for 546 units of condominium. | Permas Jaya, Johor Bahru | Completed | 
| 22 | Supply of manpower | ExxonMobil, Guntong D | 2016 | 
| 23 | Supply, Install and Commissioning of 2 unit 3.5hp split unit complete with electrical tie-in | Samsung, Terengganu Gas Terminal (TGAS) | 2017 | 
| 24 | Supply, install and repair ducting complete with dampers and instrument work | Petronas Kerteh | Completed | 
| 25 | Provision of Heating, ventilation and airconditioning, maintenance services for penisular Malaysia Region for Petronas Group of Companies | Petronas Facilities, Central Region | Completed | 
| 26 | Supply & install HVAC for battery & UPS room for bardegg & baronia project (EPCC) | Petronas Carigali Facilities | Completed | 
| 27 | Provision of Engineering Consultancy and Installation at Onshore Gas Terminal Kerteh | Petronas Carigali, Kerteh | Completed | 
| 28 | PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF HEATING, VENTILATION AND AIR CONDITIONING (HVAC) SYSTEM AT BINTULU CRUDE OIL TERMINAL (BCOT) | Petronas Carigali, Bintulu | Completed | 
| 29 | 8-way Pipe PN10 110mm Black Pipe for Telekom Malaysia Bukit Anggerik Cheras | ASADRA (M) SDN BHD | Completed | 
| 30 | 2-way Pipe PN10 150mm Red Pipe for TUDM PPU (TNB) Pulling Cable 630mm Single Core | SEGMENT EFEKTIFE SDN BHD | Completed | 
| 31 | Trace cable sludge pit using RADIODETECTION RD8100 with skilled operator | Kilang Sawit Lepar Utara 6 (FGV)  | 2015 | 
| 32 | Supply manpower, equipment, tools and machine for electrical work for condensate tank |  Kilang Sawit Kechau B (FGV) | 2015 | 
| 33 | Repairing work for breakdown at Kilang Sawit Pasoh | Kilang Sawit Pasoh (FGV) | 2015 | 
| 34 |  Wiring ripple mill A&B | FPI Bukit Sagu | 2015 | 
| 35 |  Wiring ripple mill A&B |  FPI Tementi | 2015 | 
| 36 | Supply manpower, equipment, tools and machine to replace seven length of cables | Kilang Sawit Lepar Utara | 2015 | 
| 37 | Supply manpower, equipment, tools and machine for electrical work for condensate tank | Kilang Sawit Lepar Utara | 2015 | 
| 38 | Supply manpower, equipment, tools and machine for electrical work for shredded machine | Kilang Sawit Jengka 3 | 2015 | 
| 39 | Pemasangan elektrik untuk pembinaan Ibu Pejabat Polis daerah (IPD) Johor Bahru Utara, Johor Darul Ta’zim. |  IPD JB Utara, Jabatan Kerja Raya Malaysia. Johor Bahru Utara, Johor Darul Ta’zim  | 2015 | 
| 40 | Utama yang mengandungi 42 Bilik Darjah, dan Lain-lain Kemudahan yang berkaitan | Kota Tinggi, Johor Darul Ta’zim | 2017 | 
| 41 | Cadangan Membina Dan Menyiapkan Sebuah Dewan Serbaguna Dan Kerja-Kerja Berkaitan Di Atas Tapak Balai Raya Sediada Lot PTD 144457, Taman Impian Emas |  Majlis Perbandaran Johor Bahru Tengah, Johor Bahru, Johor Darul Ta’zim  | 2020 | 
| 42 | Proposed Two Units Light And Medium Factory At Lot 6887, Mukim Bandar Mas | KEJORA Kota Tinggi, Johor Darul Ta’zim | 2020 | 
| 43 | Menyiapkan baki kerja mereka bentuk 300 unit rumah pangsa PPR di Pengerang, Kota Tinggi Johor | Kementerian Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan  | 2021 | 
| 44 | Kerja-Kerja Pembaikan Kecacatan Sistem Elektrikal Bagi Cadangan Membina Pusat Penyelidikan Pengolahan Efluen dan Kitar Semula Air Bagi Kompleks Intergrasi R&D Getah Mampan di Atas Sebaahgian Lot 322, Stesen Penyelidikan LGM Kota Tinggi, Johor Darul Takzim |  Lembaga Getah Malaysia | 2020 | 
| 45 | Maintenance work at LGM-ETP (Electrical) IPC |  Lembaga Getah Malaysia | 2020 | 
| 46 | Provision of General Electrical Equipment Services for PETRONAS Chemicals Derivatives Sdn. Bhd. (Package 1A) |  Petronas Chemicals Derivative Sdn. Bhd.  | On-going | 
| 47 | Contract of “Installation and Maintenance of LED Lighting for EPC PCGD Kerteh” | TNB ES / PCOGD | 2023 | 
| 48 | Lotte Project: MV Cable Diagnostic Test at Pasir Gudang |  ENI Specialist Sdn. Bhd. (Pasir Gudang)  | 2020 | 
| 49 | Generator Assembly and Disassembly | SJ Kenyir Unit 1 | 2018 | 
| 50 | Transformer Test & HV Power Cable | Intel Technology Sdn. Bhd.  | 2019 | 
| 51 | Protection Relay Calibration |  Petronas Chemical Fertilizer Sdn Bhd  | 2021 | 
| 52 | Perform Breaker Trip Test For New MCCB 50A Of Power Capacitor (Sat) | Nucleus Energy Sdn Bhd | 2021 | 
| 53 | 132 Kv Hv Power Cable Test |  Amsteel Mills Sdn Bhd, Klang  | 2021 | 
| 54 | Protection Relay Calibration | Amsteel Mills Sdn Bhd, Klang  | 2021 | 
| 55 | MV Power Cable Testing Work at PE 3 Plant | Lotte Chemical Titan (M), Tanjung Langsat  | 2021 | 
| 56 | NC1 Plant:Switchgear Current Transformer Test | Lotte Chemical Titan (M), Pasir Gudang  | 2021 | 
| 57 | Diagnostic Test Of Mv XLPE 6.6KV Rated Voltage (C2 C3 Project At Johor Port, Pasir Gudang) | Eni Specialist Sdn Bhd | 2022 | 
| 58 | Condition Monitoring Test on 85 MVA, 33/1/1 KV Smelting Furnace Transformer After MR Tap Selector Service |  Amsteel Mills Sdn Bhd, Klang | 2022 | 
| 59 | Shutdown 2022 – Protection Relay Calibration for (442 Nos) | Malaysian Refining Company Sdn Bhd  | 2022 | 
| 60 | 11 KV VCB Panel (MC-5 Substation) Protection Relay Calibration | Amsteel Mills Sdn Bhd, Klang  | 2022 | 
| 61 | TA 2022 – Tangent Delta Test For 132 KV Switchyard Equipment | RP Chemicals Malaysia Sdn Bhd  | 2022 | 
| 62 | Protection Relay Calibration |  Malaysian Refining Company Sdn Bhd  | 2022 | 
| 63 | Voltage & Current Transformer Verification and Protection Relay Calibration |  Petronas Chemical Methanol Sdn Bhd, Wilayah Persekutuan Labuan  | 2022 | 
| 64 | Re-Calibration of Protection Relay | Hyundai Engineering Malaysia, Melaka  | 2022 | 
| 65 | Air Circuit Breaker (ACB) Test | RP Chemicals Malaysia Sdn Bhd  | 2022 | 
| 66 | Proposal to Build a N.P.K Fertilizer Warehouse in Westport, Klang, Selangor  | Sinergi Sdn Bhd | 2015 | 
| 67 | Construct and complete an additional building block of four (4) floors, a school building special education and related work at school Cab. Chiku 7, Gua Musang, Kelantan”  | JKR | Completed | 
| 68 | Upgrading works for hostel block A and block B and centre of registration building at Institute Kemajuan Desa (INFRA) | KKLB | 2013 | 
| 69 | Renovation works for korea rental warehouse at Palm Spring Kota Damansara, Petaling Jaya, Selangor | K Rental Networks Sdn Bhd  | 2022 | 
| 70 | Renovation works for warehouse at 14, Jalan TSB 5, Kota Damansara | Chungho (M) Sdn Bhd. | 2023 | 
| 71 | 4-way Pipe PN10 110mm Black Pipe for Telekom Malaysia Sentul | ASADRA (M) SDN BHD | Completed | 
| 72 | 1 cct 33kV for TNB at PMU Pandamaran to PPU Cargill Pulling Cable | TIANU SDN BHD | Completed | 
| 73 | 1 cct 33kV for TNB at PPU Bandar Baru Bangi to SSU Stenta Film HDD Method | TIANU SDN BHD | Completed | 
| 74 | Supply and Install New Information Boards at Level 6, Wisma Kontena for Johor Port Berhad | JPB | On-going | 
| 75 | Construct New Stages for Photographer Platform and Raise Up Platform for Photo Session at Level 6, Wisma Kontena for Johor Port Berhad. | JPB | On-going | 
| 76 | Work to Lay 33kV Cables at SSU Cargill Palm – TNB | TNB Distribution | Completed | 
| 77 | Supply and Deliver Two (2) Units of New Electric Cars for Use at MIROS PC3 Laboratory, Melaka | MIROS | Completed | 
| 78 | Electrical Exhaust Fan for LQ Annex Project | DESB | Completed | 
| 79 | Supply and Deliver Roof Exhaust Fan | MALAKOFF | Completed | 
| 80 | Supply, Install, Calibrate, and Deliver Sensor Instrumentation for Q6 and Q10 Dummy, as well as Supply, Install, Calibrate, and Deliver Sensor Instrumentation and Data Logger for WorldSID-50 Dummy for Use at MIROS PC3 Laboratory, MIROS | MIROS | On-going | 
| 81 | Maintenance of Mechanical Sdn Bhd Equipment for Gas District Cooling (M) | GDCM | On-going | 
| 82 | To Supply and Corrective Maintenance (CM) for AHU-GM2-8 | GDCM | On-going | 
| 83 | 1cct 132 kv PMU NUSAJAYA- GDS | Rentak Segar SDN BHD | 2024 | 
| 84 | 11kv PE JALAN SONGKET – Jalan SONGKET 5 | Nura Angkasa SDN BHD | 2023 | 
| 85 | 11kv LRA KAHANG-PMU BT4 KLUANG | YM Teras | 2022 | 
| 86 | 1cct 33kv PPU ARA SENDAYAN – SSU AJINAMOTO | Motobina SDN BHD | 2025 | 
| 87 | 3cct 33kv. PPU AFIAT – PMU PERLING | Motobina SDN BHD | 2025 | 
| 88 | )40mm polypipe 6 way YTL,- data center kulai – tg pelepas | Sutera Utama | 2024 | 
| 89 | 40mm polypipe 6way YTL, -data center kulai – menara ansar | Sutera Utama | 2024 | 
| 90 | 40mm poly pipe 6 way. SPEDDLINK – kedex – nusantara | Famm Fatt SDN BHD | 2024 | 
| 91 | To Supply and Corrective Maintenance (CM) for AHU-GM2-8 | GDCM | 2025 | 
| 92 | Horizontal Directional Drilling(HDD) PROJECT – SEDELI | MOTOBINA | 2025 | 
| 93 | Membekal perkhidmatan reprogramming VSD untuk kegunaan Jabatan Kejuruteraan Mekanikal dan Pembuatan. | UKM | 2025 | 
| 94 | Horizontal Directional Drilling(HDD) PROJECT – SELESA JAYA, JOHOR | FASTPRO/ DATUM ENERGY | 2025 | 
| 95 | HVAC refurbishment for Medical manufacturing facilities | Ilham Karya Sdn Bhd | 2025 | 
| 96 | To design M&E system for gas station PETRONAS M RESIDENCE | ESEF ACE ENTERPRISE | 2025 | 
| 97 | To check condition cable for 11KV for underground cable TNB | TCI | 2025 | 
| 98 | Furnace 3 Shutdown YM-1363 | PCOGD | 2025 | 
| 99 | Horizontal Directional Drilling(HDD) PROJECT – BATU ANAM, SEGAMAT, JOHOR | TELCOLINK NETWORK | 2025 | 
| 100 | Horizontal Directional Drilling(HDD) PROJECT – BATU KURAU, PERAK | WCWL COMMUNICATION | 2025 | 